Recall
En Ru Uk
Volterra
Sunvin 14
About project
  • Novoukrainka, Kirovograd region
  • Solar


Yearly irradiation

1,455 kWh/m2

Commissioned

06.2019

Grid connection

Kirovograd oblenergo

PVPP

8.8 MW D.C

Panels

Longi Solar (345 Wp)

Invertors

KStar (500 kWac)

Annual Production

15,57 MWh

Tariff (net of VAT)

157.8

Local content premium

5%


Other projects